Bid risk
You have to price power, charging and grid connection earlier than ever before.
100 KW TO 5 MW, NO GRID CONNECTION
Power on your site with no connection, no fuel tank and no queue at the grid operator. A fixed price per kilowatt-hour, delivered within 80 days.

THE PROBLEM
Construction sites and industry are going electric, but the grid is full. Waiting for a connection takes years, diesel generators are expensive and dirty, and new climate requirements can shut you out of projects altogether.
The EU is extending zero-emission requirements from municipal projects to every construction site, public and private. No emission-free power means no project.
You have to price power, charging and grid connection earlier than ever before.
No power means idle machines and a project at a standstill.
Temporary connections, transformers and batteries turn into major project costs.
Electric machines need a stable power supply before you can make the switch.
Every municipality sets different requirements, which makes standardising hard.
When everyone draws power at once, the local grid runs out of headroom.
Large contractors are judged on emissions and environmental performance.
Misjudged energy costs eat your margin on fixed-price contracts.
Fail the emission-free requirement and you lose the project.
Energy becomes a production factor you have to plan like machines and people.
THE ANSWER
EFLUXER is a complete power platform inside a standard 20ft or 40ft container. It arrives by truck, stands on your site within 80 days and delivers power day and night, with no grid connection and no fuel tank.
Power around the clock. Two days a year the unit stops for planned maintenance; the other 363 it runs.
No weather, no grid, no surprises. Energy security you control yourself.
Nothing burns on your ground, so no exhaust fumes, no particulates and no nitrogen where your people work.
THE NUMBERS
Output, price per kWh and lifespan are supplied by the manufacturer. Payback is calculated against the fuel cost of a diesel generator with the same annual output, at the Dutch national statistics office pump price. The full sum is on the economics page.
WHERE EFLUXER WORKS
Powering cranes, crushers and pumps on site.
Full output in tight spaces between buildings.
Heavy machinery, far from any grid connection.
Running before the permanent connection arrives.
Electric machines charge overnight at full output.
Shredders and crushers run emission-free.