Major infrastructure projects
Local power for machines, crushers, pumps and temporary lighting, month after month.
5 MW of continuous output, far beyond the grid.
- No waiting for a grid connection
- Predictable power for every machine
- The unit moves with the project
Inner-city construction sites
City projects with high climate ambitions and limited grid capacity. EFLUXER fits through the gate and meets the requirements.
No emissions on site, quiet operation, one container.
- No emissions on site, so neighbours and inspectors stay satisfied
- Fits where a bank of diesel generators never would
- Meets strict municipal emission requirements
Roads, tunnels, rail and ports
Critical infrastructure far from any socket: kilometres of road, tunnel boring, rail works and port operations.
Heavy infrastructure power, anywhere along the route.
- Power far beyond the reach of the grid
- One unit travels with the work front
- Reliable in dust, vibration and weather
Temporary power before the grid
Full construction power while you wait months or years for the permanent connection. In a congested area a new large-user connection sits in the queue.
Site power from day one until the grid takes over.
- Start building on day one, not after the grid permit
- Full power for cranes, site huts and tools
- Switch to the grid the moment it arrives
Machine charging and battery hub
Overnight and rapid charging for electric excavators, trucks and tools.
A 5 MW charging hub that never sleeps.
- Charge the whole fleet overnight
- Rapid charging during the day
- One hub for machines, trucks and tools
Demolition, recycling and offshore
Industrial power for demolition sites, recycling crushers and offshore work.
Robust power that absorbs peak loads.
- Heavy power for shredders and crushers
- No grid needed at remote sites
- Runs steadily through peak loads
Energy partner for industry
A strategic partner for energy in construction and industry: documented climate effect, standardised solutions, long contracts.
One partner, one platform, forty years of service.
- One partner for all project power
- Documented CO₂ savings for your reporting
- Standardised units, predictable costs